English
INTRANET
DASHBOARD
Folder
Notification
Dokumen
Toggle
Tajuk
Tarikh
Muat turun
pdf
1. Notification of first occupation of factory - JKJ 101
(43622 muat turun)
Popular
13 Sep 2013
Muat turun
(pdf, 254 KB)
pdf
2. Notification in respect of taking over of factory - JKJ 102
(10951 muat turun)
Popular
03 Sep 2013
Muat turun
(pdf, 124 KB)
pdf
3. Notification in respect of building operation and works of engineering - JKJ 103
(74411 muat turun)
Popular
22 Ogs 2014
Muat turun
(pdf, 172 KB)
pdf
4. Notification in respect of permission to install machinery and issue of certificate of fitness in respect of steam boiler, unfired pressure vessel or hoisting machine not being a hoisting machine driven by manual power - JKJ 105
(67988 muat turun)
Popular
04 Sep 2013
Muat turun
(pdf, 129 KB)
pdf
5. Notification of first installation of machinery (other than machinery for which a certificate of fitness is required) - JKJ 106
(26205 muat turun)
Popular
04 Sep 2013
Muat turun
(pdf, 144 KB)
INTRANET
DASHBOARD